Development of Advanced Work History Management System
The client addressed us with a problem: a huge amount of data on production process was accumulated at the plant and was not used.
Product
Storage and work history management system is a system allowing for storage of produced cars’ data. The level of data detail provides for prompt finding out which worker installed a certain part on a specific car. To obtain this solution the client needed development of an instrument for data integration from inner systems into the new integrated project management system created by us. The storage and work history management system developed by First Line Software allows to easily analyze the data on production quality and quantity as well as to obtain data on each worker, his errors and achievements history.
Challenge
The client addressed us with a problem: a huge amount of data on production process was accumulated at the plant and was not used. The decision was made concerning the parameters for analysis of these data and user-friendly presentation of the data. The client already had a vision of the system based on which we developed the concept of the future warehouse management system software.
The system was developed within the shortest time possible – three months. The solution was commissioned in several stages. Initially production structure was developed, staff trainings were performed, and after that the data were inserted in the system. Currently the solution is actively utilized at Hyundai plant and meets the high requirements in productivity and corporation security.
Accomplished tasks
- Document writing
- Action plan elaboration
- Software design
- Software testing
- Software integration
- Staff training
- Client support at software operation
Project results
The Advanced Work History Management System allowed user to quickly receive details about the cars produced and the employees involved in the process. The information is presented in the form of comparison graphs of different staff groups’ production quality. The project data management system employs the workers administration option: automatic input of data on the time and place of their work, refresher training courses they had, times of in lieu, and sick leaves.
Project Technology
- Java
- JSP
- Hibernate
- Oracle DB
Download
Download Case Study
related projects

Visual recognition mobile app for counting forestry materials
The goal of a timber holding company was to improve accounting and control systems for lumber production by precisely counting their in-stock building materials.
Show details
Printed catalog converted to digital format and integrated with newly automated subscription service
First Line Software was engaged to create a digital subscription catalog and integrate it into the online subscription order placement system.
Show details
Liebherr warehouse tower cranes plant automation
First Line Software in cooperation with the viastore WMS SYSTEMS team has automated the warehouse of the plant producing tower cranes which belongs to Liebherr holding.
Show detailsContact Us
USA
Cambridge MA
1 Broadway,
14th Floor,
Cambridge MA 02142
USA
San Mateo CA
400 Concar Dr,
San Mateo California
94403
Netherlands
The Hague
Louis Couperusplein 2,
4th floor 2514HP,
The Hague
Australia
Sydney | Brisbane
12 Creek Street,
Brisbane QLD 4000
United Kingdom
Gloucestershire
Cowley House,
12 Black Jack Street Cirencester
Gloucestershire, GL7 2AA
Czech Republic
Praha
Na Hřebenech
II 1718/8,
140 00 Praha 4
Czech Republic
Brno
Centrum, Šumavská,
Šumavská 416/15,
602 00 Brno

Send us a note
We'll do our best to answer within one hour